Santa Rosa Tunnel

The work benefits more than a million people

Project description:

The project is located on the district boundary between Rimac and San Juan de Lurigancho, in the province and department of Lima. The work consists of two underground road pipelines.

The southern tunnel is 232, while the northern tunnel is 240 m. With a width of 11 m and a height of 8 m each. The more than one million people are benefited by reducing the travel time to their homes or work centers.

 

Our services include:

  • Construction of two tunnels, a road pair and an embankment.

General information

  • Client: Municipality of Lima
  • Location: Lima, Peru
  • Period: 2013 – 2015

Main data

  • Cold Recycled Base: 120,000 m3
  • Superficial Treatment: 106 m2

Important figures

Related projects