Kepashiato Compressor Plant

With the expansion of the pipeline, it is now possible to transport 1,540 million cubic feet per day of natural gas from Camisea

 

 

Project description:

The project is a 72,000HP natural gas compression plant in the vicinity of KP 127 of the Transportation System, near the town of Kepashiato, Cusco.

The Compressor Plant is part of the commitments agreed with the Peruvian Government in the Addendum to the Boot contract to increase the capacity of the transportation system in final sections to 920 MMSCFD.

 

Our services include:

 

  • Mobilization, Roads and Accesses, Installation of Contractor Camp, Detail Engineering, Procurement of Plant Balance and loose supplies. Civil and Electromechanical Construction until Commissioning of Compressor Plant KP 127.

General information

  • Client: Transportadora de Gas del Perú (TGP)
  • Location: Cusco, Peru
  • Period: 2013 – 2016

Main data

  • Plant capacity: 1,540 MMSCFD
  • Concrete: 8,600
  • Structures assembly: 630 t
  • Equipment Erection: 1,600 t
  • Piping: 1,573 t
  • Instrumentation: 738 u
  • Cables:  161,137 ml
  • N° of MH: 4.5 MM