Cerro Corona

Its construction was a great milestone for the production of gold in Peru

The Cerro Corona project is an open pit mine, which is located 90 km from the city of Cajamarca at 3,500 meters above sea level. At the time, its construction was a great milestone for the production of Gold in Peru.

 

Our services include:

  • Construction of a 17,000 t / day copper and gold concentrator plant. Includes civil works, fabrication and assembly of structures, assembly of equipment, fabrication and assembly of 21 tanks, assembly of pipes up to mechanical completion.

General information

  • Client: Gold Field La Cima
  • Location: Cajamarca, Peru
  • Period: 2007 – 2008

Main data

  • Plant Capacity: 17000 t/day
  • Concrete: 16500 m³
  • Assembly of structures: 2100 t
  • SAG Mills: 1 de 24′ x 14.5′
  • N° of MH: 2 MM