Infrastructure

Santa Rosa Tunnel

Project description:

The project is located on the district boundary between Rimac and San Juan de Lurigancho, in the province and department of Lima. The work consists of two underground road pipelines.

The southern tunnel is 232, while the northern tunnel is 240 m. With a width of 11 m and a height of 8 m each. The more than one million people are benefited by reducing the travel time to their homes or work centers.

 

Our services include:

  • Construction of two tunnels, a road pair and an embankment.
  • Cold Recycled Base: 120,000 m3
  • Superficial Treatment: 106 m2

Explora más
proyectos

Termosuria Ciclo Combinado

Ver proyecto

Enap

Ver proyecto

Temosuria

Ver proyecto