Energy

Platanal Hydroelectric Plant

 

 

It is currently one of the most modern hydroelectric plants in Peru.

 

Our services include:

 

  • Construction of the North Dam (Fill h = 33 m) and South Dam (Fill h = 13 m), spillway, improvement of 77 km of roads, assembly of the steel armor in the vertical shaft of the forced conduit and in sections of the tunnel of adduction and the temporary and permanent camps of the project.
  • Power: 105 MW
  • Flow: 40 m3/s
  • Asphalt concrete: 11,000 m3
  • Dam: North: 33m. South: 13 m

 

 

 

Explora más
proyectos

Termosuria Ciclo Combinado

Ver proyecto

Enap

Ver proyecto

Temosuria

Ver proyecto