Project description:
The project constitutes between 20-25% of the energy generated from the use of Camisea Gas. The thermoelectric plant will have a generation capacity of 520 MW through the combined cycle process, of which 300 MW will be generated through the use of natural gas and 220 MW through steam processing.
Our services include:
Made withby Manya.pe