Project description:
The project is part of the expansion of the main network that supplies natural gas to the neighbors of Lima and Callao in Peru. Which is composed of a main duct and secondary ducts.
Our services include:
- EPC of the City Gate and Terminal Station, cathodic protection system, SCADA control and communications system. Construction of a 34 km gas pipeline of 30 ”steel pipe and 5 km of 20” pipe supplied by Calidda. Commissioning and commissioning.